ARIFUHangzhou Airifu Environmental Technology
Precision flotation · ARFU

Fourth-generation flotation: the bubble is the machine

Every generation of flotation has been an argument about bubble size. Dissolved air settled at 20–100 µm. The fourth generation starts at 40 nm, and the rest of the design follows from that.

White paper ARFU-2026-0611 · five models, 5–200 m³/h

Four generations in one table

GenerationBubble sizeSeparationWeak point
1st · Dissolved air (DAF)20–100 µmPressurised dissolution, release nozzleLow collision efficiency on fine particles and emulsified oil; 20–30% recycle ratio
2nd · Shallow layer20–60 µmShallow tank, short retentionSmaller footprint, same bubble floor
3rd · Compact swirl (GEM type)10–50 µmSwirl contact, compact vesselBetter kinetics; still limited by gas dissolution
4th · ARFU (SiC + swirl + staged)40 nm – 50 µmMembrane gas generation, swirl cutting, staged injection, zero-velocity separationMembrane is a consumable; feed solids need pre-screening

What the four stages buy you

94% TSS removal

Staged injection extends gas–liquid–solid contact along the flow path. Measured at Cui Jiagou mine water; conventional DAF typically lands near 85% on the same duty.

0.18 kWh/m³ measured

Because operating pressure is 0.1–0.5 bar, not 4–6 bar. The high-pressure dissolution tank is the single biggest energy consumer in a classic DAF, and it is gone.

50% of the footprint

Zero-velocity separation needs less area for the same rise rate, and the absence of a saturation vessel removes a whole skid.

30–50% less sludge

A coherent float layer carries less water. That is a disposal cost line, not a cosmetic difference — haulage is often the second-largest operating cost after energy.

Where the numbers came from, and where they stop

Cui Jiagou mine water, 2×75 m³/h, accepted 2025: effluent 0.18–0.20 NTU against a 0.5 NTU reuse limit, TSS removal 94%, specific energy 0.18 kWh/m³ · Keshiketeng oily wastewater, 50 m³/h (ARFU-2025-099) · 500 t/h nanobubble flotation system, TSS removal 99.8% on a high-solids feed. The 94% figure is a mine-water result. On emulsified oil with high surfactant load, expect less, and require a bench test before you commit to a guarantee.

Retrofit: keep the basin, change the heart

Most plants with a flotation problem do not need a new basin. They need a new gas source. Three tiers, in increasing scope and cost:

TierScopeDowntimeTypical result
Tier 1 · Drop-inReplace the release system with a nanobubble generator; keep tank, scrapers, and civil works3 daysBubble size falls by two orders of magnitude; chemical dosing typically down 30–50%
Tier 2 · Contact zoneTier 1 plus a staged injection manifold and a revised contact zone1–2 weeksTSS removal into the 90%+ band on suitable feed
Tier 3 · New unitComplete ARFU skid alongside or replacing the old basin4–6 weeksFull 94% / 0.18 kWh/m³ performance, 50% footprint

Downtime figures assume the existing basin can be isolated. On a single-train plant with no bypass, add the tie-in time — and tell us about it early, because it changes the recommendation more than the water chemistry does.

When a retrofit is the wrong answer

  • The basin is hydraulically short-circuiting. Fix the baffles first; a better bubble will not fix a dead zone.
  • Solids loading exceeds what any flotation unit can float — pre-settle or screen instead.
  • The failure is downstream: oil in the effluent is emulsified below 10 µm and stabilised by surfactant. Flotation lifts free oil; dissolved oil needs chemistry or membrane.

Send a photo of the existing basin and the last water analysis

That is usually enough to say whether Tier 1 will do, or whether you are looking at a new unit.

Discuss a retrofit → The membrane inside it