Membrane fouling control

Make the cleaning cycle longer, not the membrane cheaper

Fouling is the hidden cost of every membrane plant: lost flux, chemical cleaning, downtime and eventually premature replacement. There are two places to attack it — the surface, and the feed.

MBR · UF · RO pre-treatment · verified at 1160 m³/h

Where the money goes

In an MBR, aeration for membrane scouring alone consumes more than half of the plant's operating energy, and conventional millimetre bubbles do a poor job of it: they rise away from the surface instead of scouring it. Meanwhile every chemical clean costs money, produces a waste stream and shortens membrane life.

Two routes, and they are not alternatives

ROUTE 01 · THE SURFACE

Scour with nanobubbles

Finer bubbles at the same gas flow create far more surface interactions and a looser cake. Installed on the existing aeration line, a nanobubble generator raises the number density by orders of magnitude at the same energy, and the cake becomes easier to remove rather than being compacted onto the surface.

ROUTE 02 · THE FEED

Cut the load before the membrane

Every kilogram of oil and solids removed upstream is a kilogram the membrane does not have to store. Flotation ahead of the membrane is usually the cheaper intervention, and it is the one most plants skip because the membrane is already installed.

The two compound. At Cui Jiagou, nanobubble flotation removes the coal fines first, and the 20 nm SiC membrane behind it then holds 0.18 NTU with a cleaning interval measured in months rather than days.

Measured at full scale

ProjectConfigurationResult
Ningbo seawater RO pre-treatment1160 m³/h flat-sheet SiC with nanobubble pre-treatmentCleaning cycle held at 20–25 days; effluent 0.2 NTU
Cui Jiagou mine water2×75 m³/h, nanobubble flotation + 20 nm SiC0.18 NTU, 94% TSS removal, accepted 2025
Oilfield produced waterHypergravity swirl + SiC, TDS 30,000–60,000 mg/L<10 mg/L oil for reinjection

Source: Ningbo project test report (May 2024) and acceptance report (November 2025); Cui Jiagou scheme ARFU-2025-083. The comparison baseline is the site's own previous cleaning frequency, not a generic industry figure.

What fouling control cannot fix

  • A membrane already at end of life. Scouring does not restore a delaminated skin layer.
  • Scaling from supersaturation. If the concentrate is above saturation for calcite or gypsum, no amount of bubble scouring prevents crystallisation inside the module.
  • Biofouling inside a spiral-wound element. Once a biofilm forms in the feed spacer, cleaning is the only route; prevention has to happen upstream.

How to size the intervention

  • Measure the current cleaning interval and the cost per clean (chemicals + labour + lost output).
  • Identify whether the foulant is organic, biological, colloidal or crystalline. The answer decides whether you need scouring, oxidation or pre-treatment.
  • Set the success metric as cleaning interval, not flux. Flux recovers after a clean; interval is what you are buying.

What is your current cleaning interval?

Give us that plus the foulant analysis, and we will tell you which of the two routes applies — or whether neither will move the number.