ARIFUHangzhou Airifu Environmental Technology
Sizing & payback

From duty point to model number, in five steps

Sizing is not complicated. It is a translation exercise: turn "we need to fix this" into a flow, a gas source, a material and an installation point. Most quotation errors come from skipping step one.

The five steps

STEP 01

Fix the three numbers

Flow (m³/h) or water-body volume (m³); water quality (current DO, hardness, COD or oil content, salinity); and temperature. For a cooling loop, size the slipstream at 3–5% of circulating flow — higher hardness pushes it up. For an open water body, size from volume and turnover, not from flow.

STEP 02

Pick the duty, then the series

Aeration duty is sized from oxygen demand. Separation duty is sized from hydraulic flow. These two framings get confused in quotations constantly — always ask which one a supplier is quoting.

STEP 03

Choose the gas source

Air is enough for aeration and for most flotation. Oxygen buys retention time in high-load water. Ozone is for oxidation and disinfection and needs a different seal and off-gas package — see the ozone page.

STEP 04

Fix material and installation

SUS304 is fine on the two smallest CRP models with clean water. Anything with chlorides — seawater, high-salinity effluent, some mine water — starts at 316L regardless of flow. Then confirm the power supply (220 V or 380 V), the available footprint and whether remote monitoring is required.

STEP 05

Write the acceptance test

Target parameter, measurement method, sampling point, duration, and what happens if the result lands between pass and fail. This is the step that protects both sides, and the one most often left out.

RESULT

One or two models, not a range

If a supplier sends you a table of eleven options, the sizing was not done. The output of this process is a model number, a specific energy figure and a list of assumptions that would change it.

Series quick reference

SeriesFlowHeadTypical dutyNotes
CLW0.5–20 m³/h18 mWater-body restoration, lakes, wetlandsStarts at 220 V; 100–300 nm
LOT1–20 m³/h20 mPonds, cages, RAS220 V up to 5 m³/h; 316L throughout
NEO≈2–50 m³/hvariesMulti-gas processes, ozoneAir / O₂ / O₃, online DO, quoted as a range
CRP5–200 m³/h18 mIndustrial wastewater, digesters, municipal304 on the two smallest, 316L above
FRY10–70 m³/h30 mDeep water, reservoirs, portsDelivers below the thermocline
ARFU5–200 m³/h—Flotation, oil–water separation, DAF retrofit94% TSS, 0.18 kWh/m³
OWS5–200 m³/h—Produced water to <10 mg/L oilPackaged per project water analysis
SiCper element—Filtration after flotation or before RO20/50 nm, 300–600 LMH

Payback, with the formula visible

Annual energy cost = kW × hours/day × 365 × tariff

Payback (years) = installed cost ÷ annual net benefit

Net benefit has four components, and most quotations only count the first:

  • Energy saved. Matters most when replacing an old blower or an oxygen supply. Rostein measured 86% oxygen transfer efficiency against 41% — roughly half the energy for the same dissolved oxygen. Measure your existing consumption before you enter a saving percentage.
  • Chemicals and cleaning. The main benefit in descaling and flotation projects. Use the last twelve months of purchase orders, not an estimate.
  • Capacity avoided. If the alternative was a new basin, the capital you did not spend belongs in the calculation. Meister Cheese avoided a $10 million expansion.
  • Compliance value. A consent limit met without a fine is a real benefit, but it is site-specific and we will not put a number on it for you.

What we do not do

  • No "payback in three months" claim. With capital equipment and honest baselines, most industrial cases land between 18 and 48 months, and some never close.
  • No benefit stacking that double-counts energy saved and capacity gained from the same kilowatt-hour.
  • No unverifiable yield multipliers. Where we quote 10–43% yield gains from oxygenated irrigation, the source is the supplier's published agricultural data, and we label it as such.

Price basis: we quote by configuration. Gas source, material and instrumentation move the number more than the model does. For budget planning, give us flow, water analysis and target and you get a bounded range plus the operating cost estimate. Comparable imported systems typically run 1.5–2× the price of Chinese-manufactured equivalents.

Send three numbers, get a duty point

Flow, target parameter, water analysis. That is enough for a model, a specific energy figure and a payback range with the assumptions written down.

Request sizing → Browse the models first